Risks and controls

Updated on 8 November 2026

A risk is something that can go wrong. A control is something that stops it or notices it. On the board, a risk is a triangle next to a card or arrow, and a control is a shield on the step that carries it out. A risk that no control points to stands out: its triangle is filled, and the list shows it as not covered.

In the app: on the board the layer Risks and controls under View, and in the Analysis panel the tab Risks and controls

Add risks and controls

The analysis adds them in one go, with the quote from the conversation. A single Ctrl+Z removes them again. You can also add them yourself:

  1. Double-click the card or arrow it’s about. The panel has the block Risks and controls.
  2. At Choose risk or control, choose whether it’s a Risk or a Control.
  3. Type what can go wrong and what the consequence is. For a control, type what it stops or notices. You can leave the quote empty.
  4. Click Add.

A control has a few extra fields:

  • Nature: preventive (stops it) or detective (notices it).
  • Execution: manual or automated.
  • Norm and How often, for example “above 5,000 euros” and “on every invoice”.
  • Covers these risks: which risks it covers. These can be risks elsewhere on the board.

On the board

Next to a card or arrow you’ll see a triangle with the number of risks and a shield with the number of controls. If a risk there has no control covering it, the triangle is filled. The Legend explains the signs. Hover over a card to read the text and quote for each risk and control. A risk shows which control covers it. A control shows its norm, how often it applies and which risks it covers.

List in the Analysis panel

The Risks and controls tab lists everything on the board, in the order that needs attention first:

  1. Not covered: risks that no control points to. The conversation still needs to cover these.
  2. Covered: risks, with the controls that cover them indented below.
  3. Controls that cover nothing: controls that cover nothing.

Click a row to highlight the card on the board. The list reads straight from the board, not from the analysis: what you added by hand is in it, and what Ctrl+Z removed isn’t.

When you export, risks and controls are included in BPMN, Excel and the report.

Something not working?

I don't see any triangles or shields

If the layer Risks and controls is off under View, they’re hidden. If it isn’t, there’s nothing yet: the tab then says “There are no risks or controls on the board yet”. Run the analysis, or add one yourself.

A risk shows as not covered, but there is a control

The control has to point to the risk. Open the control’s panel and switch the risk on under Covers these risks. If there’s no risk on the board yet, the panel says so.